×
The submission system is temporarily under maintenance. Please send your manuscripts to
Go to Editorial ManagerWater seepage can cause serious problems in geotechnical engineering especially for construction under the water level. Baghdad metro tunnel is one of the leading vital projects to solve the major problem of crowding roadways in a highly population increase city like Baghdad. In this study, the seepage rate that will flow toward different selected points along the tunnel section across Tigris River was calculated during the excavation process, with the consideration of three different water levels of River at maximum, moderate, and minimum water depths. A three-dimensional model of the study has been modeled using the finite element software (PLAXIS 3D V20). The water seepage was observed for six different locations on each route of the tunnel. The study showed that the change of water depth in the river has no significant effect on the seepage – time curve shape. However, increasing the water level in River from minimum to maximum leads to increase the seepage rate about 15%.
The finite element method is one of the important methods in analyzing geotechnical engineering problems; its main advantage is the ability to apply for the materials exhibiting non-linear stress-strain behavior. In this study the finite element program PLAXIS 3D 2013 is used to study the behavior of the piles under the influence of seismic waves in saturated sandy soil and the effect of adding geogrid with the pile foundation. The program has been used to facilitate the representation of the real model, input the required soil parameters and implementation of seismic data. Seismic wave, the soil geometry and the pile dimensions were fixed in all models, while dimension and depth of the geogrid used were varied to study the influence of different depth and dimension in reducing the pile displacements and the pore water pressure of soil. The results show that The reduction in settlement ratio (the difference between settlement of pile without and with using geogrid to the settlement without using geogrid) for ( ×L/2), (L×L) and (2L×2L) are 10.6%, 17% and 21.3% respectively. And the settlement ratio for geogrid at depths 8.33% and 12.5% of pile length are 9.6% and 17% respectively.